紧邻地铁设施深基坑信息化施工与分析*
何春保
摘 要

(华南农业大学水利与土木工程学院, 广州 510642

摘要]为确保广州宏城广场基坑施工安全,考虑在地铁APM线隧道两侧由于不平衡开挖对地铁APM线隧道产生的偏压影响,在地铁隧道上方采用分区分层分段逐步开挖的方式开挖基坑,同时依据不同的地质条件和开挖深度采用水泥土墙+内支撑、搅拌桩+钻孔灌注桩+锚索、搅拌桩+钻孔灌注桩+内支撑、搅拌桩+地下连续墙+内支撑、旋喷桩+旋挖桩+内支撑(斜撑)等多种综合支护方案。通过详细的监测方案了解基坑支护结构的变形情况以确保基坑安全。监测数据表明:锚索拉力和基坑的水平位移主要发生在基坑土体的开挖阶段,基坑土体的平衡开挖较好地控制了地铁隧道的变形,周边的建筑物、道路和管线的变形也较小。

关键词]深基坑工程; 地铁设施; 施工方案; 信息化施工

中图分类号:TU473        文献标识码:A        文章编号:1002-848X(2014)16-0081-06

Information construction and analysis of deep foundation pit near subway facilities

He Chunbao

 (College of Water Conservancy and Civil Engineering, South China Agricultural University, Guangzhou 510642, China)

Abstract: In order to ensure the safety of foundation pit construction of Guangzhou Hongcheng Plaza, considering the eccentric earth pressure on subway APM line due to unbalance excavation on both sides of subway APM line, the piecewise and block excavation method above the subway tunnel was favorable for excavating the foundation pit. Based on different geological conditions and foundation pit depth, the cement soil wall with interior supports, mixing pile with bored piles and anchor cables, mixing pile with bored piles and interior supports, mixing pile with  diaphragm walls and interior supports, rotary churning piles and rotary drilling piles with interior supportsdiagonal braceswere combined to form the supporting scheme of Guangzhou Hongcheng Plaza foundation pit construction. A detailed monitoring scheme was laid to find out the deformation conditions of the supporting system of the deep foundation pit to ensure the safety. The monitoring data indicate that tension force of the anchor and horizontal displacement of foundation pits mainly take place in excavation stage of the foundation pit. The balance excavation of the foundation earth well controls the deformations of the APM line, surrounding buildings, roads and underground pipelines.

Keywords: deep foundation pit project; subway facility; construction scheme; information construction

*广东省科技计划项目(2010B031000026)

作者简介:何春保,博士,副教授,Email:hcb1238@163.com

参考文献

1]陈俊生,刘叔灼,莫海鸿,等. 紧邻地铁设施大型基坑工程施工方案研究[J. 岩土工程学报, 2012, 34(S1):377-382.

2]谢兆耕,傅先华. 紧贴运营地铁隧道的深基坑施工技术[J. 施工技术,201037(9)1-5.

3HU Z FYUE Z QZHOU Jet al Design and construction of a deep excavation in soft soils adjacent to the Shanghai Metro tunnelsJ]. Canadian Geotechnical Journal200340(5):933-948.

4]高广运, 高盟, 杨成斌, . 基坑施工对运营地铁隧道的变形影响及控制研究[J. 岩土工程学报, 2010, 32(3): 453-459.

5]安关峰,高峻岳. 广州地铁公园前地下空间深基坑综合支护监测分析[J. 岩土工程学报, 2007, 29(6): 872-879.

6]安关峰,宋二祥,高俊岳. 广州地铁小谷围岛站基坑支护设计与监测分析[J. 岩土力学, 2006, 27(2): 317-322.

7]安关峰,高俊岳. 广州石牌桥地铁车站深基坑信息化施工与分析[J. 岩土力学, 2005, 26(11): 1837-1840.

8]魏纲. 基坑开挖对下方既有盾构隧道影响的实测与分析[J. 岩土力学, 2013, 34(5): 1421-1428.

9]郑刚, 刘庆晨, 邓旭, . 基坑开挖对下卧运营地铁既有箱体影响的实测及分析[J. 岩土力学, 2012, 33(4):1109-1116. 