[摘要]超长混凝土地下结构普遍不设结构缝,通常采用下列抗裂措施:验算控制截面最大裂缝宽度(仅考虑重力荷载效应),预留温度后浇带降低成型收缩拉应力,用构造配筋与加强混凝土养护控制温度裂缝。研究表明,这些常规抗裂措施的综合效果难以定量判断,存在较大不确定性,不能保证此类结构的抗裂性能可满足抗渗漏、耐久性与正常使用要求。针对此问题,结合某新建工程,模拟其超长混凝土地下结构浇筑成型步骤、先后浇筑混凝土之间变形差约束作用、各部位构件实际内力增加过程,考虑混凝土弹性模量与收缩变形规律、环境最大可能降温、后浇带构造的影响,不考虑混凝土初始缺陷与后期裂缝的影响,用MIDAS软件进行了组合应力弹塑性时程分析,以预测结构实际抗裂性能,所述计算方法与结果可供同类结构设计与施工参考。
[关键词]超长混凝土地下结构; 后浇带; 温度裂缝; 抗裂设计; 控制部位; 组合应力; 弹塑性时程分析
中图分类号:TU398.7 文献标识码:A 文章编号:1002-848X(2014)16-0021-05
Elastic-plastic time-history analysis of the combined stress in a super-long concrete underground structure
Pan Li, Zhang Jianlin
(Institute of Building Structures, China Academy of Building Research, Beijing 100013, China)
Abstract: Generally structural gap is not set in super-long concrete underground structures. Common anti-crack measures include using temperature post-casting band to control concrete tension stress in shrinkage, setting detail rebar with careful concrete curing to control temperature cracks and considering only gravity load when checking maximum crack width on control sections. Researches show that comprehensive effects of the common measures are difficult to quantitatively be estimated and lack of validity, and this kind of structure is not ensured to fulfill requirements of anti-leakage, durability and serviceability. In view of the situation, combined with a newly-built project, simulations were made on super-long concrete underground structure casting process, deformation difference constraints effects of successively casted concrete and actual stress increase process of each component. The influence of concrete elasticity modulus, the shrinkage and deformation law, the maximum drop in environment temperature and the post-casting band construction was considered, and the influence of initial defects and later cracks was not considered. The elastic-plastic time-history analysis on the combined stress in concrete was processed by MIDAS calculation program to predict actual anti-crack performance. The calculation method and the results can be referenced by design and construction of similar structures.
Keywords: super-long concrete underground structure; post-casting band; temperature crack; anti-crack design; control region; combined stress; elastic-plastic time-history analysis
作者简介:潘立,硕士,教授级高级工程师,一级注册结构工程师,Email: Panlicabr@163.com。
参考文献
[1]JGJ 3—2010 高层建筑混凝土结构设计规程[S]. 北京:中国建筑工业出版社,2011.
[2]潘立,聂祺,张建林. 中关村电子城国际电子总部4号地块高层建筑结构超限设计可行性论证报告[R].北京:建研科技股份有限公司,2013.
[3]GB 50010—2010 混凝土结构设计规范[S]. 北京:中国建筑工业出版社,2011.
[4]GB 50009—2012 建筑结构荷载规范[S]. 北京:中国建筑工业出版社,2012.
[5]Comite Euro-International Du Beton. CEB\|FIP model code 1990: design code[M].London: Thomas Telford, 1993.
[6]中国土木工程学会混凝土及预应力混凝土学会部分预应力混凝土委员会. 部分预应力混凝土结构设计建议[M]. 北京:中国铁道出版社,1985.
[7]于琦,孟少平. 部分预应力混凝土受弯构件裂缝宽度计算方法探讨[J]. 建筑结构,2009,39(3):31-33.
[8]曹大富,许元健. 混凝土结构裂缝宽度控制的名义拉应力法[J].工程力学,1996(S2):123-126.