- 摘 要
-
(巴马丹拿建筑设计咨询(上海)有限公司, 上海 200051)
[摘要]某工程原设计方案为地上三栋高层办公塔楼,地下4层,在大部分地下室已施工至±0.000后停工。新的建筑方案对地下室功能和布局进行了调整,对地上塔楼进行了修改和加层。以塔楼B为例,介绍了新的结构设计在框架柱数量、剪力墙厚度、楼面梁布置及荷载取值等方面进行的一系列优化,更好地满足了建筑设计的要求,而且结构设计更趋于合理、经济,同时在现有地下室施工情况下顺利地进行了后续施工。
[关键词]续改建工程; 框架-核心筒; 结构优化设计
中图分类号:TU375 文献标识码:A 文章编号:1002-848X(2014)16-0013-04
Structural optimization design of the tower building in a continued construction project
Shang Shizhong, Xue Hongyu, Hu Yajun
(Palmer & Turner Consultants (Shanghai) Ltd., Shanghai 200051, China)
Abstract:
The previous design scheme of a project included 3 high-rise office towers aboveground and 4-story basement underground. The construction was shut down when the basement construction was almost completed and the relative elevation reached ±0.000. In new architecture scheme, basement function and layouts were adjusted as well as the tower aboveground, and the tower floor numbers were added. Take tower B as example, a series of optimization items were introduced including column numbers, shear wall thickness, beam arrangement and load value assignment. The new structural design tends to be more reasonable as well as economic, and meets the architecture demand much better. The continued construction was carried out successfully under the existing basement construction conditions.
Keywords: reconstruction; frame-core wall; structural optimization design
作者简介:尚世仲,硕士,工程师,一级注册结构工程师,Email: shangshizhong@p-t-china.com。
参考文献
[1]JGJ 3—2010 高层建筑混凝土结构技术规程[S]. 北京:中国建筑工业出版社,2011.
[2]傅学怡. 实用高层建筑结构设计[M]. 2版. 北京:中国建筑工业出版社,2010.
[3]GB 50011—2010 建筑抗震设计规范[S]. 北京:中国建筑工业出版社,2010.