您现在的位置:建筑结构>> 期 刊>> 2014年>> 第13期>>正文内容
温州鹿城广场超高层塔楼结构设计及关键问题分析
包佐
摘 要

 

(上海建筑设计研究院有限公司, 上海 200041

摘要]温州鹿城广场为超高层建筑,塔楼建筑高度与结构高度均为350m。基础采用钻孔灌注桩,桩径为1 100mm。上部结构采用带加强层的框架-核心筒结构,共设置了三道加强层。采用工字形钢梁与压型钢板组合楼板。顶部7层取消南北方向的外框柱,采用吊杆承受楼面荷载和拉索支承幕墙体系。

关键词]超高层建筑; 钻孔灌注柱; 筏板基础; 风洞试验; 拉索; 吊杆

中图分类号:TU973      文献标识码:A      文章编号:1002-848X(2014)13-0086-06

Structural design and analysis on key structural issues of super high-rise tower of Wenzhou Lucheng Plaza

Bao Zuo

 (Shanghai Institute of Architectural Design & Research Co., Ltd., Shanghai 200041, China)

Abstract: Wenzhou Lucheng Plaza is a super high-rise building. The tower height, either architectural or structural, is 350m. The foundation adopts boring piles with pile diameter 1 100mm. The super structure is a typical frame-core system with outrigger. There are 3 strengthened storeys. The floor framing is I-shape steel beams and profiled steel sheet composite RC slab. On the 7 top storeys, the outer frame columns in both north and south are eliminated, tension posts are employed to carry the floor loadings, and cables are used to support curtain wall system.

Keywords: super high-rise building; boring pile; raft foundation; wind-tunnel test; cable;  tension post

作者简介:包佐,高级工程师,一级注册结构工程师,Email:baozuo@siadr.com.cn

参考文献

[1]GB 500092012 建筑结构荷载规范[S].北京:中国建筑工业出版社,2012.

[2]JGJ 32010 高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2011.

[3]温州鹿城广场超高层塔楼风洞试验和等效静力风荷载研究[R].上海:同济大学土木工程防灾国家重点实验室,2009.