您现在的位置:建筑结构>> 期 刊>> 2014年>> 第08期>>正文内容
某热轧厂设备箱形基础地基处理方案比较
张孝轮
摘 要

 

(北京首钢国际工程技术有限公司, 北京 100043

摘要]某热轧厂设备箱形基础长约500m、宽4060m,底面积巨大。热轧生产线设备标高精度对基础差异沉降要求非常严格。采用桩基容易满足对热轧设备箱形基础差异沉降的要求,但耗资巨大;不采用桩基则节省投资,但存在后期差异沉降较大的风险,从而影响生产。对桩基方案与强夯地基处理方案进行了比较,并在各自基础沉降完成全过程期间(包括生产阶段),对工期、费用、生产风险进行比较,综合评估这两种地基处理方案的优劣。

关键词]箱形基础; 桩基; 强夯地基; 差异沉降; 生产阶段; 工期; 费用

中图分类号:TU473,TU472        文献标识码:A        文章编号:1002-848X(2014)08-0053-04

Comparison of ground treatment schemes for a hot strip mill equipment box foundation

Zhang Xiaolun

 (Beijing Shougang International Engineering Technology Co., Ltd., Beijing 100043, China)

Abstract: Equipment box foundation of a hot strip mill has a large area with 500 meters length and 4060 meters width. Hot strip mill equipment’s elevation accuracy calls for strict requirements for the differential settlement of the foundation. The pile foundation is easy to satisfy the requirements of differential settlement, but the cost is huge. Investment is saved if pile foundation is not used, but the differential settlement is a big risk and it will affect production. The construction period, cost and production risk of the pile foundation and the dynamic compaction ground foundation were compared in the whole process of foundation settlement period (including the production stage) to comprehensively evaluate the pros and cons of two foundation treatments.

Keywords: box foundation; pile foundation; dynamic compaction ground foundation; differential settlement; production stage; construction period; cost

作者简介:张孝轮,本科,工程师,主管设计师,一级注册结构工程师,Emailzhangxiaolun521@sina.com

参考文献

1GB 506962011 钢铁企业冶金设备基础设计规范[S.北京:中国计划出版社,2011.

2GB 500072011 建筑地基基础设计规范[S.北京:中国建筑工业出版社,2012.

3JGJ 792012 建筑地基处理技术规范[S.北京:中国建筑工业出版社,2012.

4]建筑地基基础设计规范理解与应用[M.2. 北京:中国建筑工业出版社,2012.

5]顾晓鲁,钱鸿缙,刘惠珊,.地基及基础[M.3. 北京:中国建筑工业出版社,2003.

6JGJ 62011 高层建筑筏形与箱形基础技术规范[S.北京:中国建筑工业出版社,2011.

7JGJ 942008 建筑桩基技术规范[S.北京:中国建筑工业出版社,2008.

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!