(1 福建省建筑科学研究院, 福州 350025; 2 福建省绿色建筑技术重点实验室, 福州 350025)
[摘要]介绍了软土地区平均长径比约为62且在桩顶、桩端和各土层分界面均埋设钢弦式钢筋计的12根冲孔灌注桩的静荷载试验结果。根据试验结果,分析了冲孔灌注桩的荷载传递的特性以及其极限侧阻力和极限端阻力的变化规律。讨论了冲孔灌注桩的施工工艺以及持力层性状、沉渣厚度、嵌岩深度、沉渣成分和桩端后注浆等桩端嵌固情况对其承载力的影响。
[关键词]冲孔灌注桩; 荷载传递; 极限侧阻力; 极限端阻力; 桩端嵌固
中图分类号:TU753.3 文献标识码:A 文章编号:1002-848X(2014)03-0079-05
Load transfer characteristics of punched cast-in-situ pile in soft soil area
Shi Feng1,2, Lin Qingyi1,2, Zhang Dong1,2, Liang Xi1,2
(1 Fujian Academy of Building Research, Fuzhou 350025, China; 2 Fujian Green Building Technology Key Laboratory, Fuzhou 350025, China)
Abstract: The static load test results of 12 punched cast-in-situ piles in soft soil area, which have average length-diameter ratio of 62 and steel-string transducer at pile tip, at the side of pile and at the interfaces of soil layer were introduced. According to the test results, the characteristics of load transfer and variation law of ultimate side resistance and ultimate top resistance were analyzed. The influences of construction technique, the embedded situation such as bearing strata, thickness of residue,socket length,sediment composition,pile tip post-grouting on bearing capacity of piles were discussed.
Keywords: punched cast-in-situ pile; load transfer; ultimate side resistance; ultimate top resistance; pile tip embedded situation
作者简介:施峰,教授级高级工程师,Email:fengshisf@163.com。
参考文献
[1]GUOLIANG DAI, RODRIGO SALGADO, WEIMING GONG, et al. Load tests on fullscale bored pile groups[J].Canadian Geotechnical Journal,2012,49(9):1293-1308.
[2]施峰.大直径超长钻孔灌注桩的承载性状研究[J].建筑结构,2003,33(3):3-6.
[3]王卫东,李永辉,吴江斌.上海中心大厦大直径超长灌注桩现场试验研究[J].岩土工程学报,2011,33(12):1817-1826.
[4]孙宏伟.京津沪超高层超长钻孔灌注桩试验数据对比分析[J].建筑结构,2011,41(9):143-146.
[5]董金荣.灌注桩侧阻力强化弱化效应研究[J].岩土工程学报,2009,31(5): 658-662.
[6]施峰.嵌岩桩承载力取值的探讨[J].建筑结构,2005,35(12):9-11.