南京青奥中心超高层双塔全逆作地下室桩基设计
董贺勋1,刘文珽2,任庆英2,张良平1,赵苏北1
摘 要

1 华森建筑与工程设计顾问有限公司南京分公司, 南京 2100052 中国建筑设计研究院, 北京 100044

 

摘要]南京青奥中心超高层双塔楼的3层地下室采用全逆作施工。采用大直径杯口形扩顶钻孔灌注桩实现了塔楼外框架钢管柱与桩基的可靠连接,保证了荷载的可靠传递,同时针对钢柱和工程桩提出了严格的垂直度和水平误差控制要求。由于超高层塔楼传给基础的荷载很大,C60超缓凝高强度混凝土和后注浆技术的采用有效地提高了工程桩的承载力,使工程桩能在满足逆作法施工阶段的承载力要求的同时又满足建成后承担全楼荷载的承载力要求。

关键词]逆作法; 大直径杯口形扩顶桩; C60超缓凝混凝土; 后注浆技术; 垂直度控制

中图分类号:TU473.1+2      文献标识码:A      文章编号:1002-848X(2014)01-0058-03

 

Pile foundation design of top-down construction basement of super-high-rise twin towers of Nanjing Youth Olympic Center

Dong Hexun1, Liu Wenting2,  Ren Qingying2,  Zhang Liangping1,  Zhao Subei1

(1 Nanjing Branch of Huasen Architectural & Engineering Designing Consultants Ltd., Nanjing 210005, China; 2 China Architecture Design & Research Group, Beijing 100044, China)

 

Abstract: The top-down construction method was used in the three-storey basement of super high-rise twin towers of Nanjing Youth Olympic Center. To achieve the safe transfer of loads and reliable connection of the column and pile, the cup-shaped large-diameter bored piles were originally used in this project. At the same time, the requirements of verticality control and levelness control were strictly proposed for the steel column and the pile. For the huge gravity loads of the super high-rise building transferred to the foundation, C60 super retarding high strength concrete and the post grouting technology were used. Bearing capacity of pile foundation was significantly improved by the above two methods, and the piles can meet the capacity of top-down construction stage and undertake all floors loads after the completion of the towers.

Keywords: Top-down construction method; cup-shaped large-diameter bored pile; C60 super retarding high strength concrete; post grouting technology; verticality control

作者简介:董贺勋,硕士,一级注册结构工程师,Email:donghex1@163.com

 

参考文献

1]南京青奥中心双塔楼及裙房工程岩土工程勘察报告[R.南京:南京东大岩土工程技术有限公司,2012.

2GB 500072011 建筑地基基础设计规范[S.北京:中国建筑工业出版社,2011.

3DB32/T 2911999 桩承载力自平衡测试技术规程[S.南京:江苏省技术监督局、江苏省建设委员会,1999.

4]王允恭. 逆作法设计施工与实例[M.北京:中国建筑工业出版社,2011.

5GB 502052001 钢结构施工质量验收规范[S. 北京:中国建筑工业出版社,2001.