深大基坑中大开口顺逆复合工法的应用
- 摘 要
-
(1 上海建筑设计研究院有限公司,上海 200041;2 同济大学地下与建筑工程系,上海 200092)[摘要]随着一大批深大基坑的不断涌现,常规的顺作法与传统的逆作法已经不能同时满足深大基坑在安全、环境保护、工期等各方面的要求。本文借助某一深大基坑的工程实践,引进主体结构与支护结构相结合的新形式“大开口顺逆复合工法”这一全新的设计施工理念,以解决该基坑工程中采用顺作法需要大量的临时支撑和栈桥,支撑刚度相对较小,施工和拆除支撑消耗时间长等缺点,以及逆作法存在施工速度慢、作业环境差、技术要求高、适用性限制等问题。工程实践表明,对于深大基坑,顺逆复合工法可以解决业主对工期方面的要求,能使整个或局部地下室尽快出±0.000;在复合工法基础上,引进了大开口的理念,完全改变了常规的地下施工流程,大大地改善了地下作业的条件,提高了地下施工速度;同时,也满足了周边环境的保护要求。[关键词]深大基坑;顺逆复合工法;大开口;支护中图分类号:TU398.7 文献标识码:A 文章编号:1002-848X(2013)S1-0893-05Application of compound construction of bottom-up and top-down with large opening method in large deep foundation pitWu Changjiang1, 2(1 Shanghai Institute of Architectural Design and Research Co. Ltd, Shanghai 200041, China; 2 Department of Underground Structure Engineering, Tongji University, Shanghai 200092, China)Abstract: with a large amount of deep large foundation pits rising, the demand of safety, environment protection and construction speed can’t be satisfied very well by the conventional construction of bottom-up and top-down method. Based on the construction of certain foundation pit, a new technology of combination of substructure and retaining structure, named compound construction method of bottom-up and top-down with large opening is recommended. The difficulties from bottom-up method involving large amount of temporary support, low stiffness of support, and uninstallation of support can be well resolved by means of this method, as well as those from top-down method, which includes slow construction speed, poor working condition, high technology requirements, restriction of its application and the others. It is indicated clearly that the compound construction of bottom-up and top-down method has its own superior in construction speed, and accomplishes the top slab of basement as soon as possible. Additionally, the idea of large opening on the beam-slab system is introduced to change the construction sequence entirely, and it improves the working condition and speed greatly. It is showed that it benefits the environment protection very well.Keywords:deep large foundation pit;compound construction of bottom-up and top-down method;large opening;retaining structure作者简介:吴昌将,Email: dcggz@163.com。