深圳腾讯滨海大厦设计若干关键要点
- 摘 要
-
(1 艾奕康咨询(深圳)有限公司,深圳 518001; 2 腾讯科技(深圳)有限公司,深圳 518057)[摘要] 深圳腾讯滨海大厦两栋超高层塔楼由三道连体相连,裙房从塔楼主体悬挑而出,两栋塔楼高度不等,为非对称双塔连体结构。主体结构采用型钢混凝土框架-钢筋混凝土核心筒混合结构,连体和大悬挑结构均采用钢桁架结构。本文首先介绍大厦的工程概况、结构设计的原则及结构选型要点,然后阐述连体桁架和大悬挑桁架设计考虑要点,以及温度应力和施工次序对结构影响分析。[关键词] 双塔连体结构;框架-核心筒结构;温度应力;施工次序中图分类号:TU973.14 文献标识码:A 文章编号:1002-848X(2013)S1-0033-06Several key points of Shenzhen Tencent Binhai Building designWu Hui1, Kuang Jiguang2, Chen Haijun1, Luo Riwang1, Jacky Lo1, Liu Hongmei1, Jiang Yuan1(1 AECOM Ltd. Shenzhen Office, Shenzhen 518001, China; 2 Tencent Technologies Shenzhen Ltd., Shenzhen 518057, China)Abstract: Shenzhen Tencent Binhai Building consists of two towers linked with three connective structures. Its podium is suspended by the main towers. Because the heights of two towers are different, the whole building structure is an asymmetrical twin-tower connective structure. The structural systems of towers are Steel Reinforced Concrete Composite Frame-Reinforced Concrete Corewall Hybrid Structure. Steel truss systems are adopted in the connective parts and the cantilever podium. In this paper, design principle and major considerations of structural system selection are introduced first, and then design key points of the link steel trusses and the cantilever trusses of podium are presented. Influences of temperature and construction sequence are also introduced.Keywords: towers linked with connective structures; frame-corewall structure; temperature stress; construction sequence